/
Schedule For Simulations Configuration

Schedule For Simulations Configuration

Sequence Control Table

It is possible to configure which simulations are run according to a schedule. To set it up, go to Price Parameters > SequenceControlTable:

Legend:

  1. The order in which simulations are run.

  2. The label of the simulation (in DataLoad).

  3. The target of the simulation (in DataLoad).

Calculation Flows

It is possible to configure the time period to check status and run simulations. To set it up, go to Price Configuration > Calculation Flows > Simulation Sequencer:

Legend:

  1. This logic is used to set a schedule for running the simulation.

  2. This logic is used to check and run the simulation every minute.

  3. Config time unit type. Options are: minute, hour and day.

  4. Config time unit value. An integer value.

Related content

Calculation Flows
More like this
Calculation Flows
Calculation Flows
More like this
Calculation Flows Configuration
Calculation Flows Configuration
More like this
Calculation Flows Configuration
Calculation Flows Configuration
More like this