PSP Cost Element

Lookup

  1. Search for records of the current dependency level in the selected source table. If none is found, use the dependency fallback mechanism.

  2. Filter records with current valid time configuration.

Calculation with Cost

  1. Convert the cost currency to the current currency.

  2. Perform the calculation based on the selected price strategies.

Configuration

  1. Set the data source configuration in the PriceSettingConfig PP table. Details can be found at .